How Many Bags of Concrete for a 10x10 Slab, 4 Inches Thick? (40, 60 and 80 lb)

A 10 × 10 ft slab poured 4 in thick holds 33.33 ft³ of concrete; with an 8% allowance that is 36 ft³, or 60 bags at the yield you choose.

The 10 × 10 slab in numbers

FigureValue
Slab area100 ft²
Slab volume33.33 ft³
With 8% allowance36 ft³
80 lb bags (0.60 ft³ each)60 bags

Bag size and thickness for a 10 × 10 slab

Bag and thicknessBags to buy
80 lb bags, 4 in60
60 lb bags (0.45 ft³), 4 in80
40 lb bags (0.30 ft³), 4 in120
80 lb bags, 5 in75
80 lb bags, 6 in90
80 lb bags, 4 in, 10% allowance (calculator default)62

Choosing the bag size for a small pad

Bag size changes the count far more than it changes the price per cubic foot. Quikrete publishes approximate yields of 0.30 ft³ for a 40 lb bag, 0.45 ft³ for 60 lb and 0.60 ft³ for 80 lb Concrete Mix, so a 10 × 10 pad needs about twice as many 40 lb bags as 80 lb bags (arithmetic). (Quikrete 1101 data sheet)

The lighter bag is easier to lift into a truck bed, but every extra bag is one more batch to tear open, wet and mix. Quikrete starts an 80 lb bag at about 6 pt of water and a 40 lb bag at about 3 pt, so water per cubic foot stays the same; only the handling multiplies. (Quikrete 1101 data sheet)

Quikrete calls all of its calculator yields approximate, which is why this page adds an 8% allowance on top of the flat 10 × 10 × 4 in volume. Uneven subgrade under a small pad can eat that margin quickly, so buy the rounded-up count rather than the bare volume. (Quikrete calculator)

Other sizes: 12 × 12 ft slab, 4 in. Any other size: the Concrete slab calculator.

Change the size: Concrete slab calculator for the 10 × 10 ft slab, 4 in

Project inputs

Purchase estimate

60 bags

  1. Slab volume: 100 ft² × 4 in ÷ 12 = 33.33 ft³
  2. Allowing waste: 36 ft³
  3. Divide by 0.6 ft³ per bag and round up

Frequently asked questions

How many 80 lb bags for a 10x10 slab 4 inches thick?

60 bags with an 8% allowance, based on Quikrete’s approximate 0.60 ft³ per 80 lb bag.

Is it cheaper to use 60 lb bags?

The 60 lb bag yields about 0.45 ft³, so you need 80 bags; compare the shelf price per bag times that count against the 80 lb total.

Where do control joints go on a 10x10 pad?

Quikrete says to cut 1 in deep joints every 6 ft to 8 ft, so each 10 ft side needs at least one joint; one across the middle in each direction gives four 5 × 5 ft panels (arithmetic).

Sources

  1. Quikrete 1101 data sheet
  2. Quikrete calculator